Power Plant Kozienice

Realization:
Oddział Południe

Power Plant Kozienice is the second largest power plant in Poland. As part of the modernization, the construction of a power unit with supercritical parameters with a capacity of 1,075 MW is being built. This is the biggest energy investment in Poland and will be the largest coal-fired  type in Europe.

Palisander provides formwork systems for making the structure of reinforced concrete slab of Eurosilo plaster silo, which is being built inside a circular concrete silo at the height of 11 meters. Served as a temporary support shoring towers  ID 15 were used in conjunction with Rapidshor system,  MEP props and  Superslim system. For the preparation of a round slab served also ring-arranged timber beams, which are part of the slab system PAL 20. Ultimately, the ceiling will be based on round columns with a diameter of 100 cm and a height of 9 m, which were made using the column formwork PAL-SO.